top of page

Level Uneven Floor and Fill in Drain

When renovating a warehouse or changing its layout, sometimes there are old amenities like drains that are no longer needed. This particular drain was no longer in use and was in the way. The floor was also sloped towards the drain to direct any water towards it. This made this area less functional.

The most common solution is to cut this area of the floor out and pour new concrete. This method is messy and takes too long for the space to become usable.


This is where Flash Floor excels. Within a few hours the drain has been filled in and the floor has been leveled, making the space ready to use the same day.




Comments


bottom of page